PROJECT 7 FINALLY DONE!

so my bitch IS dropped and done!
M-Sport body kit…
all moldings and accents painted to proper coordination!
Hamann lowering kit (springs and air link module)
i-forged 22″s…. powder coated glossy black face
all the work and paint and shit fabricated and installed by Platinum!

we played with the rear a little bit and when it’s in sport + mode it sinks down even more about a 1/4″ and this bitch has been killing the streets for just around 24 hours already!
got it detailed today… these pics suck, but I will have some really nice photos soon!

(click to enlarge)
before all the transformations:


STOCK BUMPER, NOT LOWERED, MOLDINGS ARE CHROME…. WHEELS NOT DONE..

and FINALLY……..


front Hamaan springs and Lowering Link Module for the Air Suspension


holla!




this bitch is tucked just right! ;)

thank you
everyone at Platinum Motorsport
especially George and Rob
thank you Vince and Peter at I-Forged…. and Falken Tires

I’m kinda happy right now. This bitch is such a beast in person!
I can’t wait for the professional photoshoot!

10 Responses to “PROJECT 7 FINALLY DONE!”

Leave a Reply

Connect With Ben Baller
Ben Baller on Facebook